Government of Madhya Pradesh is taking major steps for ensuring successful
implementation of the provisions of MGNREGA. Works enlisted in schedule-I of the
NREGA Act are been taken priority basis to provide employment and creating
durable assets in the rural areas of the state. It is being observed from the
state level that rural connectivity is the most important segment which is
required for sustainable development of villages. The state government has
launched a program namely “Mukhya Mantri Gram Sadak Yojna (MMGSY)” to achieve the above
purpose.
MMGSY has been originated in order to provide road connectivity to maximum/each
village of Madhya Pradesh within the range of population between 500 and 250
which are not covered under the Pradhan Mantri Gramin Sadak Yojna(PMGSY) till
the year 2013. Mahatma Gandhi
National Rural Employment Guarantee Scheme, Madhya Pradesh( MGNREGS-MP),
Backward Region Grant Fund( BRGF ), State Plan Head are the three functional
components for running the scheme of Mukhya Mantri Gram Sadak Yojna. Total 19,386 km
length of gravel roads will be constructed. For this the total estimated
expenditure will be of about Rs. 3,300 crore. The wage part for the construction
of road will be done by the Job Card holders under MGNREGS-MP and no contractual
work will be taken/done under MGNREGS-MP (as per NREGA act). Transportation of
soil, watering and rolling for road construction will be bifurcated in the wage
material expenditure (wage: material) ratio of 60:40 as per NREGA act. If the
above ratio disbalances then the exceeding expenditure on the material component
will be done by BRGF in the BRGF region else it will be done by State Plan Head.
Within the road the construction of Culverts/Cross Drainage will be given on
contractual basis and will be funded by BRGF or State Plan Head whichever is
applicable in the particular region.
For full implementation and management of the scheme, a Project Management
System is being designed and developed, under which monitoring and evaluation of
entered data will be done for all the three components MGNREGS-MP, BRGF and
State Plan Head individually and jointly and will be ported on the world wide web for
the purpose of maintaining transparency and accountability.